Finished my stitch book,

Entered five quilts in our guild's show (my goal was four!) I entered Paths, Creating the Blues, Window Boxes, Blueberry/Lime and Ripples. If you want to read the posts behind most of the entries, click on the links.
Completed the 6x60 inch guild challenge
I did purchase an accuquilt die; but, didn't make a project with it.
The grands and I continue to make a little progress each week on our goose project.
I haven't made a dent in sewing 50 yards of fabric from my stash; but, this next quarter, I'll be finishing some projects so I'll be able to make progress on that goal! (At least that is one of my goals!!!)
Below are my second quarter goals:
Stitch the President's blocks into a top. This is a sample of one block at left.
butterfly quilt--get it pin basted,
TQS BOM--figure out the embroidery for the border that I want to add,

Three past book club projects:
Finish this little top.
Add the skinny pieces to liven up the background and appliqué the flowers to finish the top.
Figure out how to fit the bridge on this piece and what to do with the open bottom right corner:
Keep putting in a little time each month on appliquéing the pieces that over lap the blocks on this chicken wall hanging.
Finish the quilting on the hexagon quilt BOM:
Finish the top for the guild mystery BOM quilt:
Piece the back with the leftover fabrics from the front and raid my stash for the remaining part of the back.
Keep up with the online mystery BOM:
Begin a pieced/embroidery project to keep the dust off of my embroidery skills!
This is the fabric for a pieced, appliqué and embroidered project!
Sew another 50 yards from my stash.
Have FUN!
This is a lot for a list and many of the projects are hold overs from the first quarter. I'm okay with that. As long as I'm making progress, I don't mind having long lists! Also, if I am a bit more specific about the result of the progress, perhaps, I'll make more progress!



